Caledonian Sleeper
Operator: Serco (until 25/06/23)
Period to: | 31/03/2023 | 31/03/2022 | Change | 31/03/2021 | 31/03/2020 | 31/03/2019 | 5yr change |
---|---|---|---|---|---|---|---|
£000 | £000 | % | £000 | £001 | £000 | % | |
Fares Income | 28,050 | 20,643 | 35.9% | 5,918 | 26,644 | 26,488 | 5.9% |
Other income | 873 | 521 | 67.5% | 34 | 662 | 851 | 2.7% |
Total Revenue | 28,923 | 21,164 | 36.7% | 5,952 | 27,307 | 27,338 | 5.8% |
Operating Costs: | |||||||
Staff | 12,538 | 10,674 | 17.5% | 10,167 | 10,580 | 10,683 | 17.4% |
Diesel Fuel | 2,783 | 2,151 | 29.4% | 0 | 10,580 | 10,683 | (73.9%) |
Rolling Stock | 8,521 | 8,680 | (1.8%) | 9,038 | 6,866 | 2,859 | 198.0% |
Track access | 2,282 | 6,497 | (64.9%) | 5,165 | 4,889 | 15,970 | (85.7%) |
Other | 31,987 | 35,608 | (10.2%) | 32,410 | 36,397 | 51,270 | (37.6%) |
Total | 58,111 | 63,610 | (8.6%) | 56,779 | 58,731 | 80,781 | (28.1%) |
Operating Profit before grant/premium: | (29,188) | (42,446) | (31.2%) | (50,827) | (31,424) | (53,443) | (45.4%) |
Net subsidy/premium | 30,483 | 36,463 | (16.4%) | 47,467 | 13,911 | 23,009 | 32.5% |
Operating Profit | 1,295 | (5,982) | (121.6%) | (3,360) | (17,513) | (30,433) | (104.3%) |
Operating Margins | |||||||
Pre-grant | (100.9%) | (200.6%) | (853.9%) | (115.1%) | (195.5%) | ||
Post grant | 4.5% | (28.3%) | (56.5%) | (64.1%) | (111.3%) | ||
Operating Profit to Operating Cost | 2.2% | (9.4%) | (5.9%) | (29.8%) | (37.7%) |